Can you build a factory right after buying land? Check everything before investing in Thailand
Key Takeaway

A legal checklist before buying or leasing land for a factory in Thailand: zoning, IEAT estates vs. outside estates, Class 1–3 factories, foreign land ownership and exit clauses.

A well-priced plot on a main road and close to raw materials may look ideal for a factory. But if the zoning plan does not allow it, or the business faces environmental restrictions, an attractive location can turn into a sunk cost before production has even begun.

Before you buy or lease land, you should be able to answer this question: “Can this type of factory be built on this plot, and what approvals are required?”

Looking at the zoning colour alone is not enough

Purple zones are generally associated with industry and warehousing, but they do not permit every type of factory. Likewise, you should not assume that green zones prohibit all factories. You need to read the zoning regulations that apply to the specific plot, including the type of business, the building size and any area-specific conditions.

Start with the title deed number and the exact location of the land. Check it through the system of the Department of Public Works and Town & Country Planning, then request a land-use certificate under the zoning plan, giving full details of the project. This certificate helps in making your decision, but it does not replace a construction permit or a factory licence.

Inside or outside an industrial estate: different checks apply

Industrial estates regulated by the Industrial Estate Authority of Thailand (IEAT) offer approval channels and services for operators. However, you should check which types of business the estate accepts, how far its electricity, water and wastewater treatment systems can actually support your project, and what the costs and service conditions are.

Importantly, a commercial name such as “industrial park” or “industrial zone” should not be taken to mean that the area has the same rights and procedures as an IEAT estate. Investors must verify the legal status of the area first. For land outside an estate, you must deal directly with the authority responsible under each relevant law.

A Class 3 factory needs a licence before it is set up

Under the Factory Act as amended in 2019 (B.E. 2562), a factory generally means a business of a specified type or kind that uses machinery with a total power of 50 horsepower or equivalent or more, or that employs 50 or more workers. A business does not have to meet both criteria at the same time.

If the business qualifies as a factory, you must also determine its class according to the type, kind and size of the business, rather than looking only at the horsepower or number of workers. In general, the classes are as follows.

  • Class 1: The business may operate without notification or a factory licence, but it must still comply with the relevant laws.
  • Class 2: The operator must notify the authorities and receive an acknowledgement of notification before starting operations.
  • Class 3: A licence must be obtained before the factory is set up, and the operator must also follow the procedure for notifying the start of operations. Special provisions and procedures apply inside industrial estates.

Therefore, do not start building or installing machinery on the assumption that you can apply for approval when you are ready to produce. Even if the business is too small to fall within the definition of a factory, you must still check the zoning plan, the building law, public health rules and other relevant requirements.

A factory licence does not cover everything

The project must check construction approval or notification under the building control law, including setbacks, access roads and safety. Projects that meet the criteria must prepare an environmental report, such as an EIA or EHIA, in line with the type, size and conditions set by law. Being inside an industrial estate does not automatically exempt every factory from environmental duties.

In practice, you should assess electricity capacity, water volume, flood risk, truck routes, and the cost of handling wastewater or industrial waste together, because land that is cheap to buy may cost much more to develop than expected.

Can foreign investors buy land?

Setting up a company in Thailand does not automatically give a foreign juristic person the right to buy land. For industrial projects, the main routes are applying for permission to hold land ownership under Section 44 of the IEAT Act, or exercising the right under Section 27 of the Investment Promotion Act for businesses promoted by the BOI. Both routes require approval and compliance with that agency’s conditions.

The right to hold land is separate from the right to do business. You should therefore check all the activities you plan to carry out, including any additional services or trading. BOI promotion does not replace permission under every other law.

Set out the exit in the contract before paying any money

Before signing, check the title documents, the landowner, mortgages, easements and the right of access. The contract should state clearly who is responsible for applying for approvals, by when they must be completed, and, if the project does not receive approval, on what conditions the buyer or lessee may terminate the contract and get their money back.

Completing these checks before you buy or lease lets you assess the project’s feasibility, the time to start production and the costs you will actually bear.


Footnotes

  1. Department of Public Works and Town & Country Planning, Land-use zoning inspection service and certificate request system (in Thai)
  2. IEAT, Operating manual for officers on conducting business in industrial estates (in Thai)
  3. Department of Industrial Works, Factory Act B.E. 2535 (1992) and its amendments, Office of the Council of State version (in Thai), especially Sections 5, 7, 11–13 and 30; Guide to procedures under the factory law (in Thai)
  4. Office of Natural Resources and Environmental Policy and Planning, Information, announcements and guidelines on environmental impact assessment (in Thai)
  5. IEAT, Application forms and documents on land ownership under Section 44 (in Thai)
  6. Board of Investment, Guide to applying for investment promotion 2026: rights and procedures relating to land (in Thai)
Ask us on LINECall 02-312-3789